Record what a sample inspection found, classify each defect, and decide the lot against the acceptance numbers of your sampling plan.

ON THE EXAM · CQI III.B.4, III.C.5, CQT IV.A.3, IV.C.1 · FREE · NOTHING YOU TYPE LEAVES YOUR BROWSER

Q-BotClick for an explanation of this tool.

For educational use. This page is a study aid. The method behind it has far more depth and detail than one page and one tool can cover, and what you see here is not everything the method offers or everything this site offers. For full understanding and application, use the governing standards and texts, and seek further education, training or qualified advice. Results depend on the data you enter, so check them before relying on them.

Classifying defects by seriousness

Classification puts the inspection effort and the acceptance criteria where the consequences are. Sampling standards such as ANSI/ASQ Z1.4 and common practice use three classes, described here in plain terms:

The classification belongs in the inspection plan, decided in advance, not by the inspector at the bench.

Defects and defectives

A defect (nonconformity) is one failure to meet a requirement. A defective (nonconforming unit) is a unit with one or more defects. A closure with flash and a scuff is two defects but one defective. Under Z1.4 definitions a unit is a defective of the most serious class it contains, so a unit with a major and a minor defect is a major defective. A plan states whether its acceptance numbers count defectives (percent nonconforming) or defects (nonconformities per hundred units).

Accepting or rejecting the lot

Each class has its own acceptance number Ac and rejection number Re. If the count is at or below Ac, the class accepts; at or above Re, it rejects. The lot is accepted only if every class accepts. Critical defects are usually set at zero acceptance, often with 100% inspection for that characteristic.

Rejecting a lot does not decide what happens to it. The lot is identified and segregated, and the disposition (rework, sort, use as is, return or scrap) is made through the nonconforming material process, often by a material review board.

Reading the result

The table shows defects and defective units for each class against Ac and Re, plus defects per unit (DPU) and defects per hundred units. The checks flag a missing plan, unclassified defects, a sample larger than the lot, and the switching-rule consequence of a rejection.

On the CQI exam

Expect to classify a described defect, to tell defects from defectives, and to apply Ac and Re for each class. A frequent trap is counting a unit twice because it has two defects of different classes.