Requirements traceability matrix

SCQUALITYGUILD.COM/TOOLS/REQUIREMENTS-TRACEABILITY-MATRIX.HTML

List the user needs, design inputs, design outputs, verification tests and validation studies, and link each to the one before it. The matrix builds itself and shows every gap: inputs without verification, needs without validation, and orphans on both sides.

ON THE EXAM · CQE III.B.1, III.B.2, III.D, CMDA III.D.2, IV.A.2 · FREE · NOTHING YOU TYPE LEAVES YOUR BROWSER

Q-BotClick for an explanation of this tool.

For educational use. This page is a study aid. The method behind it has far more depth and detail than one page and one tool can cover, and what you see here is not everything the method offers or everything this site offers. For full understanding and application, use the governing standards and texts, and seek further education, training or qualified advice. Results depend on the data you enter, so check them before relying on them.

What design control traces

Design control is the discipline of turning what users need into a design that provably meets it. It runs as a chain:

A requirements traceability matrix records the links, so that anyone can follow a need down to the test that proves it, or start from a drawing and find out why it exists.

The gaps it finds

Requirements from regulations and standards are often shown by verifying their inputs rather than by a separate validation study, so they are marked "by verification" rather than as a gap. Say so in the validation plan.

Risk controls in the trace

Each risk control from the hazard analysis becomes a design input, and its verification is the evidence that the control was implemented and works. Carrying the hazard ID on the input links the two files, so a change to either can be followed through to the other.

Keeping it alive

The matrix is built up through the project and reviewed at each design review. Design changes are traced the same way: which needs, inputs, outputs and tests does this change touch, and which tests must be repeated? A matrix assembled at the end, just before submission, usually shows the gaps too late to fix them cheaply.

Validation uses initial production units, or their equivalent, under actual or simulated use. A study on prototypes needs a justification of why its results still hold for the production design.

Related tools

QFD and the CTQ tree are ways to turn the voice of the customer into design inputs; the matrix keeps track of them afterward. The IQ/OQ/PQ protocol validates the manufacturing process, which is a different thing from validating the design.

On the exam

CQE III.B.1 asks you to classify design inputs from customer needs, regulatory requirements and risk assessment, and III.B.2 names requirements traceability as a design technique. CQE III.D covers interpreting verification and validation results. CMDA III.D.2 asks you to evaluate design and development controls: planning, input, output, review, verification, validation, transfer, changes and the design file. CMDA IV.A.2 asks you to verify that risk controls were implemented in the design. Expect to tell verification from validation, and to spot the gap in a short trace.