Audit plan and schedule

SCQUALITYGUILD.COM/TOOLS/AUDIT-PLAN-SCHEDULE.HTML

Write the objectives, scope and criteria for one audit, assign the team, build the timetable, and check it for scope gaps, double-booked auditors and auditors in their own area.

ON THE EXAM · CQA II.A.1, II.A.2, II.A.4, II.A.7, II.B.3, II.B.7 · FREE · NOTHING YOU TYPE LEAVES YOUR BROWSER

Q-BotClick for an explanation of this tool.

For educational use. This page is a study aid. The method behind it has far more depth and detail than one page and one tool can cover, and what you see here is not everything the method offers or everything this site offers. For full understanding and application, use the governing standards and texts, and seek further education, training or qualified advice. Results depend on the data you enter, so check them before relying on them.

What an audit plan contains

The audit plan turns one entry in the audit program into a working schedule. ISO 19011:2018 clause 6.3.2 describes its contents; in summary, the plan covers:

Objectives, scope and criteria are a favorite exam trio. If a question describes "the requirements used as a reference", it means criteria; "the extent and boundaries", scope.

Choosing the team

The lead auditor is accountable for the audit and for the team. Auditors are selected for competence in the processes and criteria and for independence from the work audited. A technical expert gives specific knowledge but works under the direction of an auditor; an auditor in training audits under supervision; guides (from the auditee) and observers accompany the team but do not take part in the audit. The tool flags sessions where none of the people present is a lead auditor or auditor, and auditors placed in their home department.

Opening and closing meetings

The opening meeting confirms the plan with the auditee, introduces the team, confirms communication channels, safety and confidentiality arrangements, and sets the time of the closing meeting. The closing meeting presents the findings and conclusions so they are understood, and agrees the timeframe for the auditee's response. Team meetings in between let auditors share evidence and agree how observations will be classified before anything is presented.

Reading the checks

Scope areas that never appear in the timetable will not be audited, and areas in the timetable but outside the scope are scope creep. The plan is a guide, not a contract: the lead auditor can adjust it as evidence emerges, but changes to scope should be agreed with the audit client.

On the CQA exam

Expect scenarios asking which element is missing from a plan, who decides the scope (the audit client, with the lead auditor), what belongs in an opening meeting, and how to staff an audit fairly.